OUR PROJECTS
Commercial
Vector has provided commissioning services on various commercial projects, from early involvement in new builds to existing facilities, optimizing energy efficiency, and ensuring occupant comfort. Our professionals bring extensive experience with numerous LEED-certified projects, including achieving LEED Platinum status for TD Ameritrade’s corporate headquarters.
We approach each unique project with emphasis on precision, quality, and cost-effectiveness to ensure your facility has reduced operational and maintenance costs and elevated, sustainable performance
Senior Market Sales
OMAHA, NE
Vector Commissioning Services was contracted by Senior Market Sales (SMS) to provide Retro-Commissioning (RCx) services and project management support for their Building Automation System (BAS) upgrade and Energy Improvement project. Vector helped improve the operation of the building’s HVAC systems during the commissioningprocess, and the BAS programming was optimized to reduce energy usage and help improve occupant comfort throughout the facility.
CLIENT
Senior Market Sales
PROJECT SIZE
80,000 SF
YEAR CONSTRUCTED
1973
RETRO-COMMISSIONING
2016
TD Ameritrade
OMAHA, NE
Project Features
– Corporate Headquarters – Twelve-story Class A office building
– LEED Platinum Certified
– Fundamental LEED commissioning services
– Central cooling and heating plant with N+1 redundancy
– Emergency power systems
– Underfloor air distribution for office floors
– Stair pressurization systems
– Dining pavilion with ground source heat pumps and kitchen ventilation systems
– Snow melt system for major pedestrian walkways
– Parking garage ventilation system
– Rainwater harvesting from parking lots for irrigation
– Solar heating system
CLIENT
TD Ameritrade
ARCHITECT
HOK
MECHANICAL ENGINEER
William Tao & Associates
PROJECT SIZE
530,000 SF
ELECTRICAL ENGINEER
Morrissey Engineering
YEAR CONSTRUCTED
2013
John Deere Corporate Headquarters
MOLINE, IL
Project Features:
-Existing Class A office building – Three (3) interconnected buildings
-LEED-EB commissioning services
-A 350-seat auditorium and Display Building for showcasing John Deere memorabilia and equipment
-Heating and cooling plant for all three (3) buildings which includes 2,000 tons of water-cooled chillers and high-temperature heating water boilers
-Custom built-up air handling units
-Snow melt system for major pedestrian walkways
-Trane building automation system
-Square D lighting controls
CLIENT
John Deere
ARCHITECT
BCDM Architects
ENGINEER
Morrissey Engineering
PROJECT SIZE
534,000 SF
YEAR CONSTRUCTED
1978
RETRO-COMMISSIONING
2011
Pinnacle Bank
OMAHA, NE
Project Features
– Four-story Class A office building
– Fundamental LEED commissioning services
– High-efficiency rooftop units with ECM fan power boxes serving the facility
– Heating water system with high-efficiency condensing water boilers
– Emergency power system
– Lighting controls
– Stair pressurization system
– Snow melt system for major pedestrian walkways
– Underground parking garage and ventilation system
CLIENT
Pinnacle Bank
ARCHITECT
HOK
ENGINEER
Morrissey Engineering
PROJECT SIZE
82,000 SF
YEAR CONSTRUCTED
2014
Gavilon Corporate Headquarters
OMAHA, NE
Project Features
– Class A office building
– HVAC & electrical system commissioning services
– Trading floor with underfloor air distribution system
– Trane air-cooled chilled water system
– Liebert computer room air handlers with N+1 for critical cooling spaces
– Emergency power system
– UPS power system
– Lighting controls
– Attached parking garage (120,000 sf) and ventilation system
CLIENT
Gavilon
ARCHITECT
Open Studio / Perkins + Will
PROJECT SIZE
112,000 SF
YEAR CONSTRUCTED
2014
1.844.438.1800
info@vectorcx.com